The project aims to create a state-of-the-art, paperless hospital in Baghdad with high-quality functional and environmental standards. It will incorporate advanced communication technologies, including PAC, HIS, and RIS systems. The design aspires to become a prominent landmark in Baghdad.
Medical Departments
Administration & Education Departments
Doctors & nursing accommodation building
Service buildings
Landscaping, fencing & entrance gates
Baghdad, Iraq
Student Housing at Baghdad University
Chartered Group of Companies is the sole subcontractor for constructing dormitories to accommodate 2500 students in the University of Baghdad complex. The client for this project is the Ministry of Higher Education and Scientific Research.
The construction includes two twin towers, each being an independent building, but they share the same common area. These twin towers will be erected on top of a two-story podium building, which will house various common facilities for student use, including but not limited to a canteen, kitchen, study halls, administration zone, clinic, and MEP services.
Baghdad, Iraq
The General Authority for Computers and Informatics
Chartered Group of Companies Contracting Co. won the competition of implementing the complex for computers and informatics for the Ministry of Higher Education and Scientific Research
The project includes the following topics:
G+11 Tower Building with a total build-up area of 20,047 m2
Two stories car parking building.
Two stories podium building.
Malty purpose 1000 sets hall.
Central MEP services building.
Landscaping such as but not limited to green areas, fountains, streets, open area theaters.. etc.
Baghdad, Iraq
Rehabilitation of Expressway No.1 Section R7
You can use a few enticing words and flaunt your capabilities that will attract future clients and encourage them to hire you right away. Our ongoing project involves rehabilitating a 145 km expressway (two-way and three lanes of one-way) in collaboration with the main contractor Tern S.A. from Greece. The scope of work includes milling, repaving with modified bitumen PG (76-10), asphalt crack repair, patching, culvert cleaning, rehabilitation of concrete culverts, and installation of road furniture like Guard Rail, chain link fence, delineators, reflecting road stud, and traffic signs. We’ll also replace bearing pads and expansion joints of all bridges along the road and perform road marking. The total project cost is US$95,685,541.60.You can use a few enticing words and flaunt your capabilities that will attract future clients and encourage them to hire you right away.
Baghdad, Iraq
Kirkuk University project
1. Kirkuk University Gates & Infrastructure Project
The project includes the implementation of mechanical networks: domestic water, irrigation water, water firefighting, well water, storm & sewerage. Total length: 57,400 ML. 5 concrete water tanks (1,800 m3 total) & 3,000 m3 septic tank with related pumping stations.
infrastructure covers electrical power supply & distribution (27,000 KVA), including substations and backup power generation.
Obligations include data & communication network setup.
Additional work: 82,500 m2 asphalted roads, 46,000 m2 walkways, 40,500 m2 garages. Landscaping university area with fountains, lakes, gardens, and main & secondary gates with fences.
Baghdad, Iraq
2. Girls dormitory complex Project
24 billion Iraqi Dinars to execute a multi-story apartment complex. It includes two B+G+4 buildings as the dormitory buildings for girls plus one G+1 building as administration of the dormitory section for the university, the scope also includes the complete building services & landscaping. The total built-up area is 40,605 m2
Baghdad, Iraq
Projects in UAE
Al Sharqan Villas
Owner: The Arab Foundation for investments and development